Yunnan Guangdun Door Industry Co., Ltd. has been deeply involved in the fire door industry for many years, offering extensive experience in the production, sales, and installation of fire protection materials.

We are pleased to provide sample contracts that address common issues in fire door procurement to assist construction companies in navigating related challenges. Our contract templates highlight common concerns related to fire doors, including installation precautions, helping construction firms mitigate procurement risks effectively.

By leveraging our expertise as a leading fire door manufacturer and fire door factory, we aim to offer valuable insights that can aid in making informed decisions and ensuring compliance with industry standards.

For more information on our fire doors and how we can assist with your next project, please visit our website.

Sample Fire Door Procurement Contract 1

Party A: (Hereinafter referred to as Party A),Party B: (Hereinafter referred to as Party B)

Through mutual consultation between Party A and Party B, Party A contracts Party B to manufacture and install fire doors for the project. To ensure the smooth and successful completion of this project, the following agreement is established:

1. Project Overview

  1. Project Name:
  2. Construction Site:
  3. Scope of Work:
  4. Contract Duration:

2. Product Quality Requirements and Technical Standards

  1. The wooden fire doors shall be manufactured and installed in accordance with the technical standard GB12955-20xx, and must pass the inspection and approval of the local fire department.
  2. Installation Quality: The door leaf opening direction, as well as the horizontal and vertical alignment of the door frame, must meet the acceptance standards.

3. Pricing Method and Total Contract Amount

  1. The wooden fire doors, classified as Class A, B, and C, within the scope of this contract shall be priced using a fixed unit price method. The comprehensive unit price is _ RMB per square meter. The unit price includes all costs such as labor, materials, off-site transportation, and profit related to the production and installation of the fire doors.
  2. The approximate area of fire doors covered under this contract is square meters, with a total estimated contract price of RMB. (See attached summary sheet for fire door area).

4. Payment Terms

  1. Upon signing the contract, 30% of the total contract price will be paid.
  2. Upon the arrival of the door frames at the site, payment will be made up to 50% of the total contract price.
  3. Upon project completion, 90% of the total contract price will be paid.
  4. After passing the inspection by the fire department, 98% of the total contract price will be paid. The remaining 2% will be held as a quality guarantee deposit, to be released one year after the warranty period expires, subject to Party A’s confirmation and without interest.

5. Project Settlement

The final project settlement will be based on the actual design opening dimensions. When submitting for settlement, Party B must provide relevant material supply receipts, certificates of conformity, and inspection reports to verify the authenticity of materials and the project volume.

6. Responsibilities of Both Parties

  1. Party A’s Responsibilities:
    1.1. Party A is responsible for coordinating on-site logistics and providing free space for material storage, water, electricity, and vertical transportation.
    1.2. Party A shall make payments according to the terms specified in the contract.
  2. Party B’s Responsibilities:
    2.1. Party B shall organize construction strictly according to the design drawings, construction specifications, and the requirements of Party A to ensure the project passes the fire inspection in one attempt.
    2.2. Party B shall designate _ as the on-site representative to oversee construction quality, safety, and progress.
    2.3. Party B is responsible for educating construction personnel on safety, ensuring compliance with Party A’s and the relevant safety, quality supervision, and environmental protection departments’ regulations. Party B is fully accountable for on-site safety and any accidents that occur during the construction process, assuming all related responsibilities and costs. Party A bears no responsibility for such incidents.

7. Quality Warranty

The warranty period for the fire doors is one (1) year, commencing the day after the fire department has approved the project or the fire safety record has been filed.

In the event of damage or malfunction during the warranty period, Party B must respond to Party A’s repair request within 24 hours and carry out the necessary repairs or replacements (excluding damages caused by human factors). If Party B fails to respond within the agreed timeframe, Party A may hire a third party to complete the repairs, and the costs will be deducted from the quality guarantee deposit. If Party B delays or refuses repairs, causing losses to Party A, Party B will be held liable for compensation.

8. Breach of Contract

  1. If Party B fails to complete the project on time due to their fault, Party B shall pay Party A a penalty of 100 RMB/day. If the delay is due to Party A’s fault, Party A shall bear corresponding responsibility.
  2. If Party A fails to make payments according to the contract, Party A shall pay Party B a penalty of 2‰ per day of the unpaid amount.

9. Dispute Resolution

In the event of a dispute between the two parties, negotiations may be conducted. If negotiations fail, either party may submit the dispute to the Yichang Arbitration Committee for arbitration.

10. Miscellaneous

This contract is made in two copies, with each party holding one. The contract becomes effective upon signature and seal by both parties. It has equal legal force for both parties. The contract will automatically terminate once the warranty period ends and the quality guarantee deposit is fully paid.

Party A (Seal): Party B (Seal):
Legal Representative (Signature): Legal Representative (Signature):
Date: Date:

Sample Fire Door Procurement Contract 2

Buyer (Party A):
Seller (Party B):

In accordance with the relevant provisions of the Contract Law of the People’s Republic of China, and after full negotiation between both parties, the following terms are agreed upon to establish this sales contract:

1. Product Name, Type, and Specifications

  1. Name: Standard wooden fire doors.
  2. Type and Specifications: Based on the drawings provided by Party A, the dimensions and specifications will be confirmed through on-site measurements by Party B to arrange production.

2. Product Quality Standards

  1. The product must comply with the general technical conditions for wooden fire doors established by the national fire safety department.
  2. Based on Party A’s design drawings, Party B guarantees delivery, installation, and compliance with fire safety inspection standards.
  3. When installing the door frame, holes must first be drilled, followed by the insertion of wood and securing with nails. The paint used will be from the ___ brand, and the fire-rated hardware will be from the ___ brand.

3. Delivery Unit, Method, Location, and Deadline

  1. Delivery Unit:
  2. Delivery Method: Products will be delivered to the designated construction site and installed.
  3. Project Scope: Fire doors for ___ (including basement and podium building).
  4. Delivery Deadline: The installation of the door frames will be completed by ___ (year) ___ (month), in synchronization with the civil construction schedule. If delays occur due to Party A, the project timeline may be extended. If Party B fails to complete the work within the agreed timeframe, a penalty of 500 RMB/day will be imposed on Party B without objection.

4. Product Pricing, Quantity, and Payment

  1. Unit Price: Fire doors are priced at ___ RMB/㎡ (uniform pricing for Class A, B, and C doors). This price includes the door frame, door leaf, fire-rated hardware, installation, transportation, paint, and excludes taxes and decorative works.
  2. Project Quantity: Approximately ___ ㎡ (final measurement will be based on actual dimensions).
  3. Total Amount: Approximately ___ RMB (excluding taxes).
  4. Payment Terms: a) Payments will be settled in phases: After completing the installation of the main building’s fire doors, including the basement and podium areas. In cases where specific basement door frames cannot be installed due to objective reasons, a written explanation will be provided without affecting the payment settlement. b) After the installation of door frames, Party A will measure the exterior dimensions of the installed door frames, calculate the total amount (with any door less than 1 square meter being rounded up to 1 square meter), and pay 20% of the total to Party B. After the entire project passes initial inspection, an additional 55% will be paid. Once the project passes the fire safety inspection, the remaining 20% will be paid in full without interest. The remaining 5% will be held as a quality guarantee deposit for one year (starting from the date of fire inspection approval), to be paid in full without interest after the warranty period ends.

5. Quality Assurance and After-Sales Service

  1. Party B guarantees the quality of the products in terms of materials, workmanship, and delivery time.
  2. Party B will provide certification documents, product inspection reports, and certificates of conformity for the products.
  3. During the one-year warranty period (starting from the date of fire inspection approval), if any quality issues arise, Party B will provide free replacement and repairs (excluding human-caused damage). Party B must respond within 12 hours of receiving a notification for replacement or repair.

6. Relevant Responsibilities

  1. Upon entering the site, Party A has the obligation to coordinate the work between Party B and the construction unit (including providing free vertical transportation and water and electricity access for Party B).

7. Dispute Resolution

Any disputes arising during the execution of this contract will be resolved through friendly negotiations. If the negotiations fail, either party may submit the dispute to the local court of Party A for legal resolution.

8. Copies and Legal Effectiveness

This contract is made in four copies, with three held by Party A and one by Party B. It becomes effective upon signature and seal by both parties and has equal legal force.

Party A (Seal): ___________ Party B (Seal): ___________
Legal Representative (Signature): ___________ Legal Representative (Signature): ___________
Date: _________, _________ Date: _________, _________

Sample Fire Door Procurement Contract 3

Supplier (Party A):
Buyer (Party B):

In order to regulate the purchase and sale of wooden insulated fire doors and to protect the legitimate rights and interests of both parties, this contract is signed after friendly negotiations between Party A and Party B, in accordance with the Contract Law of the People’s Republic of China and relevant laws and regulations. Both parties agree to comply with the following terms and conditions:

1. Product Name, Trademark, Model, Quantity, and Amount

The total amount is approximately ___ RMB, subject to the actual measurement of the door openings. The amount includes transportation, installation, maintenance, product protection, taxes, profit, and all other associated costs.

2. Quality Requirements and Technical Standards

The products shall be produced according to the relevant national fire safety regulations, ensuring that the fire doors meet the necessary quality standards to pass the fire safety inspection. Party A guarantees that the fire doors will be accepted in one inspection. Should the doors fail to pass the inspection, all related costs will be borne by Party B.

3. Delivery Time

Party A must deliver and install the fire doors at the construction site within 15 days after receiving notification from Party B following the signing of the contract.

4. Invoice

Party A will provide an official invoice, with taxes calculated at 6%.

5. Delivery Location and Method

Party A will be responsible for delivering the fire doors to the construction site, including hardware and installation. Decorative trims and surface painting are excluded.

6. Calculation Method

The final quantity will be calculated based on the actual door opening dimensions.

7. Payment Terms and Settlement

After the door frames are installed at the site, Party B will pay 30% of the total price. Once the door leaves are installed, another 40% will be paid. After installation is completed and both fire safety and final inspections are passed, Party B will pay up to 95% of the total price. The remaining 5% will be held as a warranty deposit and will be paid in full without interest after one year.

8. Breach of Contract

This contract becomes effective immediately upon signature and stamping by the authorized representatives of both parties. Both parties must strictly adhere to the terms and conditions of this contract. In the event of a breach, the defaulting party shall bear all liabilities for breach of contract.

9. Product Substitution and Quality Defects

If Party A substitutes materials or provides products of inferior quality, or fails to deliver as agreed, Party B has the right to purchase the required products from other suppliers and terminate this contract. Any resulting consequences and costs will be borne by Party A.

10. Conditions for Contract Termination

  1. The quality and model of the products supplied by Party A do not meet the contract specifications.
  2. Any economic losses incurred by Party B due to the poor quality of the products provided by Party A.
  3. The contract is successfully fulfilled.

11. Dispute Resolution

In case of any disputes arising from this contract, both parties will first attempt to resolve the issue through friendly negotiations. If the dispute cannot be resolved, it shall be submitted to the People’s Court in the locality of Party B for resolution.

This contract is made in four copies, with each party holding two copies.

Party A (Seal): ___________ Party B (Seal): ___________
Legal Representative (Signature): ___________ Legal Representative (Signature): ___________
Date: _________, _________ Date: _________, _________

Sample Fire Door Procurement Contract 4

Party A:
Party B:

In accordance with the Contract Law of the People’s Republic of China and relevant laws and regulations, both parties have reached an agreement regarding the supply and installation of fire doors. The following contract is hereby established.

Article 1: Project Overview

  1. Project Name:
  2. Project Address:

Article 2: Product Details, Trademark, Specifications, and Models

  1. Trademark and Product Name:
    Party B shall supply ______ brand steel fire doors manufactured by ______ Group Co., Ltd.
  2. Product Specifications, Models, Quantities, and Prices:
    This contract’s fixed price includes raw material costs, manufacturing costs, hardware, transportation, loading/unloading, on-site installation, taxes, profit, general contractor management fees, and subcontractor coordination fees. Party A will settle the payment based on the actual quantity installed. Party B is responsible for the final quantity, with any discrepancies covered by Party B.General contractor management fee and subcontractor coordination fee will be calculated at ___% of the total subcontracted project cost (including vertical transportation, water, and electricity fees), which Party A will withhold and pay to the general contractor.

Article 3: Payment and Settlement

  1. Settlement:
    Final payment will be based on the actual number of fire doors installed on site at the prices outlined in Article 2, Section 2. Any changes in the door-opening direction will not affect the product price.
  2. Payment Terms:
    • Partial deliveries and partial payments: After each batch arrives at the site and passes Party A’s inspection, 80% of the payment for that batch will be made, and Party B will provide a full invoice.
    • Upon successful project completion and acceptance by the fire department, 90% of the payment will be made.
    • After the project is inspected by Party A’s engineering department, property management company, and the project section, payment will be made up to 95% of the total amount.
    • The remaining 5% will be held as a quality warranty deposit and returned without interest one year after acceptance, provided no quality issues arise.

Article 4: Delivery Location, Time, and Installation Period

  1. Delivery Location:
  2. Delivery Time:
    The first batch of doors must arrive by ________, and all products must be delivered within 15 days of the first delivery.
  3. Installation Period:
    Installation will begin on ________ and be completed by ________. Any changes to the installation schedule will be communicated by Party A in writing.

Article 5: Packaging Standards and Recycling

Packaging will be the responsibility of Party B and must meet industry standards. Party B will not recycle packaging materials.

Article 6: Transportation and Costs

Transportation will be carried out by Party B at their own expense and risk. Party B is responsible for ensuring the safe delivery to the designated location, including loading and unloading. Party A will coordinate vertical transportation. Any damages during transportation will be borne by Party B.

Article 7: Technical Specifications and Requirements

  1. Technical Specifications:
    • Door frame steel thickness: 1.2mm, with an edge width of no less than 7cm.
    • Door leaf thickness: No less than 68mm for Class A and Class B fire doors, and no less than 50mm for Class C fire doors.
    • Fire resistance rating:
      • Class A: ≥1.5h
      • Class B: ≥1.0h
      • Class C: ≥0.5h
    • The filling material must be high-quality perlite board.
  2. Specific Requirements:
    • All materials must use high-quality cold-rolled steel from Baosteel.
    • All hardware (locks, hinges) must have a melting point of at least 950°C.
    • Fire doors must meet GB 12955—______ standards.

Article 8: Acceptance

  1. Final Acceptance:
    After installation, Party B must provide a completion report. Party A will organize an inspection within 3 days. If corrections are needed, Party B will bear the costs. Acceptance will be considered final upon Party A’s written confirmation of the project.

Article 9: On-Site Requirements and Responsibilities

  1. Party B must provide a construction plan and comply with phased acceptance standards.
  2. Party B is responsible for product protection until the project is handed over.
  3. Party B must adhere to safety regulations and work according to Party A’s project schedule.

Article 10: Warranty and After-Sales Service

  1. Warranty Period:
    Party B provides a two-year free warranty. During this period, repairs must be made within 12 hours of notification, with completion within 8 hours. Otherwise, Party A may arrange repairs at Party B’s expense.
  2. After-Sales Service:
    Party B provides lifetime maintenance. After the warranty period, only material costs will be charged for repairs.

Party A (Seal): ___________ Party B (Seal): ___________
Legal Representative (Signature): ___________ Legal Representative (Signature): ___________
Date: _________ Date: _________

Fire Door Procurement Contract Template 5


Purchaser (Party A):
Supplier (Party B):

In accordance with the “Contract Law of the People’s Republic of China,” the “Construction Law of the People’s Republic of China,” and other relevant laws and regulations, and adhering to the principles of equality, voluntariness, fairness, and good faith, both parties have mutually agreed to enter into this contract.


1. Project Overview:

  • Project Name:
  • Project Location:

2. Product Name, Quantity, Model, and Pricing Table:

  • [Details to be filled in]

3. Delivery Date:

  1. Party A shall notify Party B at least seven (7) days in advance to initiate on-site installation. If Party B fails to commence installation as per Party A’s construction schedule, a penalty of 0.03% of the total contract value will be imposed for each day of delay.
  2. Transportation method and associated costs will be handled by Party B.

4. Technical and Quality Standards:

  1. Products shall be manufactured according to the approved standard drawings.
  2. Manufacturing will be based on drawings signed and approved by Party A.
  3. Acceptance shall be conducted in strict compliance with the regulations and acceptance standards set by the provincial and municipal authorities, ensuring that the quality of the project is qualified.
  4. If the project fails to meet acceptance standards, Party B must promptly rework at their own cost until it meets the required standards. Party B shall also bear a breach penalty of 5% of the total contract value for any rework required.

5. Payment and Settlement Terms:

  1. Party A designates [name] as the person responsible for settling the payment for this contract. Any settlements made by other individuals will not be binding on Party A. The final settlement will be based on the actual fire door area installed. Party A shall actively cooperate with Party B to finalize the settlement within 30 days of project completion.
  2. Payment will be made as follows:
  • No payment will be made upon completion of door frame installation. After the door panels are installed and accepted by Party A and the project supervision team, [X]% of the contract value (excluding hardware and paint) will be paid.
  • Upon final project acceptance or when the owner moves in, [X]% of the contract value (including hardware and paint) will be paid. The remaining 5% will be retained as a warranty fund, payable after the two-year warranty period.
  1. Party B must provide a corresponding tax invoice before receiving payment. If Party B’s invoice is deemed illegal by government authorities, Party B must provide a legal invoice and bear any resulting losses incurred by Party A. Party A reserves the right to pursue further claims if necessary.
  2. Payment shall be made via bank transfer to the following account:
  • Bank: [Name of bank]
  • Account Number: [Account number]
    If Party B requests payment to any other account, a written authorization must be provided.

6. Safety Measures:

  1. Adhere to the policy of “Safety First, Prevention Foremost,” involving all personnel in safety management. Construction safety regulations must be strictly enforced.
  2. Prior to construction, all workers must be registered and receive safety education from the project safety department.
  3. Regular safety inspections of equipment must be carried out. Any safety violations must be immediately rectified.
  4. Construction must be carried out in strict accordance with the construction plan and safety regulations. Safety officers will conduct daily checks and halt any violations.
  5. Workers must wear safety helmets on-site, and those working at heights must wear safety belts.
  6. Party B is solely responsible for any accidents occurring during the construction process, including all legal and economic liabilities.

7. Product Protection:

Party B is responsible for protecting the products from moisture, sunlight, theft, and damage upon delivery to the site. Any damage or loss due to insufficient protection will be borne by Party B.


8. Breach of Contract:

  1. Both parties must strictly adhere to the terms of this contract. Any breach will result in penalties.
  2. Party B must deliver products as per the agreed schedule. Any delays that cause losses to Party A will result in a penalty of 0.03% of the contract value per day.
  3. Party A must make timely payments as per the contract. In case of delay, a penalty of 0.03% of the overdue amount will be charged daily.

9. Confidentiality:

This contract contains significant business secrets and must not be disclosed by either party.


10. Effectiveness and Termination:

This contract becomes effective upon signature and seal by both parties and will terminate upon full payment. Party B shall provide a statement confirming that all payments have been received before final payment.


11. Dispute Resolution:

Any disputes arising under this contract shall be resolved through negotiation. If negotiations fail, the dispute will be settled in the local People’s Court where the project is located.


12. Copies of the Contract:

This contract is made in four (4) copies, with two (2) copies held by each party.


Party A (Seal): _ Party B (Seal): _
Legal Representative (Signature): _ Legal Representative (Signature): _
Date: //_ Date: //_

Fire Door Procurement Contract Template 6


Party A:
Party B:
Construction Unit (Party C):

In relation to the procurement of steel fire doors for the construction project undertaken by Party A and Party C, all three parties have reached a consensus through negotiation and hereby enter into this Supply Contract (hereinafter referred to as the “Contract”).


1. Basis of the Contract

The basis for this Contract includes:

  1. The “Contract Law of the People’s Republic of China”;
  2. Design standards, technical agreements, and construction drawings;
  3. The material supply list provided by Party B based on Party A’s drawings;
  4. National industry standards applicable to the products;
  5. The invitation for quotation.

2. Steel Fire Doors Specifications, Quantity, and Brand

  • The specific specifications, dimensions, and quantities must be confirmed through on-site measurements by both Party A and Party B. Party B is responsible for measuring and verifying the on-site specifications and quantities.

3. Total Contract Price

The total contract price in RMB includes all costs related to the completion of the project, such as labor, materials (including main materials, hardware, door locks, handles, glass windows, installation accessories, etc.), transportation, unloading, packaging, machinery use, testing and inspection, optimization design, and risk costs during installation. The quotation also includes potential price increase risks and other miscellaneous costs (e.g., vertical transportation). The contract price includes glass windows at 170 RMB per piece (specification 220×620). If glass windows are not required, their cost will be deducted from the total price. Grouting costs are not included in the total price and will be paid directly by the construction unit based on on-site certification.


4. Technical Requirements for Steel Fire Doors

  1. Door Frame Steel Plate: Cold-rolled galvanized steel plate, thickness ≥ 1.5mm
  2. Door Panel Steel Plate: Cold-rolled galvanized steel plate, thickness ≥ 0.8mm
  3. Door Panel Filling Material: Non-combustible material, must comply with “General Technical Conditions for Steel Fire Doors”
  4. Door Panel Thickness: Grade A not less than 50mm, Grade B not less than 45mm, Grade C not less than 40mm
  5. Surface Flatness of Door Panels: ≤ 2mm/m
  6. Coating Requirements: Electrostatic spraying process (film thickness ≥ 20μm)
  7. Color Requirements: Steel fire doors shall be in RAL6027
  8. Fire Observation Window Glass Requirements: Must comply with “Fire Protection Standards for Steel Fire Doors”
  9. Fire Resistance Duration: Grade A not less than 1.5 hours, Grade B not less than 1.0 hours, Grade C not less than 0.6 hours

5. Contract Performance, Supply Period, and Location

  1. Within 5 days prior to signing this Contract, Party B shall pay Party A a performance bond of 10% of the contract price (5% for quality and 5% for construction period). This bond will be refunded without interest within 10 days after project acceptance. If Party B fails to pay the bond as required, Party A may terminate the Contract at any time.
  2. Within 30 days of signing the Contract, Party B must ensure the delivery of doors and windows. After delivery, installation must be completed within 20 days. Party A will notify Party B 10 days in advance for door panel delivery, and installation must be completed within 20 days after delivery. If Party B fails to supply or install as per the contract schedule, the performance bond for the construction period will be forfeited, and Party B will be liable for all losses and legal responsibilities. If the quality of the supplied steel fire doors or installation does not meet standards, the quality performance bond will be forfeited.
  3. Party B must deliver the products to Party A’s construction site free of charge.
  4. Party B must provide a warranty letter for the supplied products at the time of contract signing; otherwise, Party B will be disqualified from supplying. The warranty period for the products is two years. Any quality issues during the warranty period will be repaired or replaced free of charge. The warranty bond is 5% of the settlement amount, refunded without interest within 30 days after the warranty period ends.
  5. Party C is responsible for the brand and pricing of the invited suppliers.

6. Payment Terms

  1. Within 7 working days of signing this Contract, Party A will pay Party B a 30% advance payment.
  2. 70% of the contract price will be paid within 10 days of door frame delivery on-site. 85% will be paid upon delivery of door panels. 95% of the contract price will be paid after the entire installation is completed and accepted. The remaining 5% will be retained as a quality warranty fund and paid within one month after the warranty period ends (without interest).

7. Packaging Requirements

All products provided by Party B must be packaged according to product requirements. Packaging costs are included in the total contract price and will not incur additional charges.


8. Delivery and Inspection

  1. Party B is responsible for transportation, loading, and insurance, and all related costs are covered by Party B (included in the total price).
  2. Prior to delivery, Party B must conduct a thorough inspection of the product quality, specifications, and models, and provide a delivery list with the products. Party B guarantees that the products are new and unused.
  3. Upon delivery, Party A and the construction unit will inspect the products, and signing the delivery list will be considered as acceptance of external quality (internal quality will be assessed after the warranty period).
  4. After installation and acceptance by the fire department, Party A and Party B, along with the construction unit, will sign the settlement list.

9. Quality Guarantee

  1. The warranty period is two years after the completion and acceptance of the project.
  2. During the warranty period, Party B will provide free maintenance and replacement services. After the warranty period, Party B will continue to offer related services at discounted prices and provide related parts.
  3. Party B will not be liable for quality issues arising from:
  • Unauthorized repairs, modifications, or dismantling by non-authorized personnel.
  • Damage caused by human factors, natural disasters such as floods, fires, earthquakes, etc.

10. Dispute Resolution

  1. Any disputes arising from or related to this Contract should be resolved through amicable negotiation. If negotiations fail, either party may submit the dispute for mediation and litigation as per the contract regulations.
  2. All disputes under this Contract will be under the jurisdiction of the People’s Court at the location of the damage.

11. Contract Effectiveness and Miscellaneous

  1. This Contract becomes effective upon signature or seal by authorized representatives of both parties. The Contract is made in nine copies, with Party A, Party B, and the construction unit each holding three copies. The Contract will terminate upon expiration of the warranty period.
  2. Technical agreements, drawings, product lists, invitation for procurement, Party B’s quotation, and commitment letters have equal legal effect.
  3. Party B’s installation or supply personnel must comply with safety operation regulations, wear safety helmets, avoid unauthorized entry into hazardous areas, and refrain from dangerous operations. All responsibilities and economic losses arising from safety accidents will be borne by Party B.
  4. Any matters not covered in this Contract will be resolved through negotiation between the parties.

Party B:
Party C:

In conclusion, we hope that these fire door contract templates will assist construction companies in mitigating risks and improving procurement efficiency. Our goal is to provide valuable tools that streamline the process and ensure successful project outcomes. If you have any questions or need further assistance, please don’t hesitate to reach out.